5 Estimating Mistakes to Avoid in 2025

5 Estimating Mistakes to Avoid in 2025

Introduction

Accurate estimating is the foundation of a profitable electrical contracting business. However, even minor mistakes can lead to costly overruns, lost bids, or financial setbacks. As the industry evolves, staying ahead means refining your estimating process and eliminating common errors that impact profitability.

Avoid these five estimating mistakes in 2025 to improve accuracy, save time, and maintain a competitive edge.

1. Guessing at Labor Costs

Labor is one of the largest expenses in an estimate and miscalculating it can make bids uncompetitive or eat into profits.

Why This Happens

  • Lack of precise labor tracking, leading to inaccurate hourly cost estimates.
  • Forgetting to factor in overtime, taxes, or benefits.
  • Relying on outdated labor rates instead of real-time data.

How to Fix It

  • Use a labor burden calculator that includes wages, taxes, insurance, and benefits to determine true labor costs.
  • Track employee productivity to estimate labor hours more accurately.
  • Regularly update labor rates to reflect industry trends and market conditions.

2. Overlooking Indirect Costs

Many estimators primarily focus on direct costs such as materials and labor, but studies in construction management highlight that indirect costs—including permits, insurance, equipment depreciation, and administrative expenses—can account for a significant portion of a project's total budget.

The Risk

  • Underbidding and losing profit margins.
  • Unexpected costs arising during the project, leading to financial strain.

How to Fix It

  • Develop a checklist of indirect costs, including travel expenses, fuel, and disposal fees.
  • Maintain a historical database of indirect costs for more accurate forecasting.
  • Use estimating templates that automatically factor in overhead and indirect expenses.

3. Ignoring Fluctuations in Material Prices

Material costs, especially for commodities like copper and steel, fluctuate due to supply chain disruptions, tariffs, and seasonal demand shifts. Using outdated prices can result in bids that are too high (losing jobs) or too low (losing money).

How to Fix It

  • Subscribe to industry pricing databases for real-time material cost updates.
  • Build in contingencies for volatile materials when drafting estimates.
  • Maintain good supplier relationships to secure bulk pricing and discounts.

4. Failing to Track Change Orders

Scope changes are common in electrical contracting, but if they’re not documented and billed correctly, they can lead to revenue loss.

The Risk

  • Absorbing unapproved costs, reducing project profitability.
  • Disputes with clients over additional work are not reflected in the final invoice.

How to Fix It

  • Implement a formal change order tracking system.
  • Require written approval for any project modifications.
  • Regularly communicate with clients about scope changes and budget impacts.

5. Sticking to Manual Estimating Methods

Pen-and-paper calculations or outdated estimating software increases the risk of human error, slows down the bidding process, and limits scalability.

Why This Matters

  • Manual math mistakes can cause incorrect bids.
  • Paper estimates are difficult to update and revise.
  • Digital tools offer automation, accuracy, and real-time collaboration.

How to Fix It

  • Transition to cloud-based estimating software that allows for real-time updates and seamless collaboration.
  • Use automated tools to streamline labor, material, and overhead calculations.
  • Invest in training to ensure your team efficiently utilizes digital tools.

Conclusion

Avoiding these five estimating mistakes will help electrical contractors work more efficiently, win more jobs, and maintain profitability in 2025. As the industry grows more competitive, refining your estimating process is essential to long-term success.